The trajectory of the Artemis II mission 2026 Apr01--Apr11

    Figure: The trajectory of the Artemis II mission 2026 Apr01--Apr11

    Caption: The trajectory of Artemis II (2026 Apr01--Apr11) (Wikipedia: Artemis II: Mission).

    On Apr06, Artemis II reached 406,771 km (63.7758 Earth equatorial radii) from Earth's center which was the record greatest distance for humans from Earth at that time (Wikipedia: Artemis II: Lunar flyby). The mean Earth-Moon center-to-center distance 384,748 km = 60.3229 Earth equatorial radii (R_eq_⊕ = 6378.1370 km)).

    Credit and/or file tracking information follows to the divider line:

    Image Credit/Permission: NASA, 2023 / Public domain.
    Image link: Wikimedia Commons: File:Artemis 2 map march 2023.jpg.
    Local file: local link: moon_artemis_ii.html.
    File: Moon file: moon_artemis_ii.html.